文档文本内容
高 中
时 事
一座沉睡了 20 年的垃圾山正在深圳消失
A 20-Year-Old Garbage Mountain Disappearing in Shenzhen
核心词汇
environmental [ɪnˌvaɪrən
ˈment(ə)l]
adj. 环境的;有关环境的
million ['mɪljən]
num. 百万;大量
urban [ˈɜːrbən]
adj. 城市的;都市的
expand [ɪkˈspænd]
v. 扩大;膨胀;更充分地阐述
necessary [ˈnesəseri]
adj. 必需的;必要的;必然的
community [kəˈmjuːnəti]
n. 社区;团体;群落
challenge [ˈtʃælɪndʒ]
n. 挑战;盘问;质疑;怀疑 / v.
提出挑战;质疑;驳斥
problem [ˈprɑːbləm]
n. 难题;问题
engineer [ˌendʒɪˈnɪr]
n. 工程师;机械师 / v. 设计(工
程);策划
system [ˈsɪstəm]
n. 系统;体系
equipment [ɪˈkwɪpmənt]
n. 设备;装备
control [kənˈtroʊl]
v. 控制;操纵 / n. 控制;管制
recycle [ˌriːˈsaɪk(ə)l]
v. 再循环
process [ˈprɑːses]
n. 过程;进程;工序 / v. 处理;
加工
material [məˈtɪriəl]
n. 材料;原料 / adj. 物质的
单词数:218个
@2026/01/25 ✅每日1篇时事精读 ✅高效积累高中3500词
DATE:
A large-scale environmental remediation project is
underway in Shenzhen to tackle the Yulong Landfill in
Luohu District, the biggest landfill excavation project in
China. Sealed for 20 years, the landfill holds about 4.1
million tons of waste. Launched in 2024 and to be
finished by late 2026, the project is necessary because
the once suburban landfill has become part of
Shenzhen's urban core as the city expanded.
The project faces great challenges, as the landfill is
only 100 meters from a residential community. To
扫码点读听音频
temperature [ˈtemprətʃər]
n. 温度;气温;体温
facility [fəˈsɪləti]
n. 设施;特定场所;特色功能;
资质
generate [ˈdʒenəreɪt]
v. 产生;引起;发(热、电)
electricity [ɪˌlekˈtrɪsəti]
n. 电学;电力
household [ˈhaʊshoʊld]
n. 家庭 / adj. 家庭的;家喻户晓
的
alongside [əˌlɔːŋˈsaɪd]
prep. 在…旁边;与…一起 / adv.
在…的侧面;与…并排
restore [rɪˈstɔːr]
v. 恢复
release [rɪˈliːs]
vt. 释放;发布;发行;放开;n.
释放;发布;发行;释放令
sustainable [səˈsteɪnəb(ə)l]
adj. 可以忍受的;可支撑的;可
持续的
ecological [ˌiːkəˈlɑːdʒɪk(ə)l]
adj. 生态的;生态学的
economic [ˌiːkəˈnɑːmɪk]
adj. 经济(上)的;可赚钱的
development [dɪˈveləpmənt]
n. 发展;开发
combine [kəmˈbaɪn]
v. 组合;结合
social [ˈsoʊʃ(ə)l]
adj. 社会的;社交的 / n. 社交聚
会
benefit [ˈbenɪfɪt]
n. 利益;好处;救济金 / v. 有益
于;有助于
核心词组
1. power generation
发电
2. divided into
分成
3. carried out
实施
4. waste excavation
废物挖掘
solve odor and dust problems, engineers have installed
a gas extraction and air injection system, and mobile
equipment sprays deodorizer on site, building a
multi-layered environmental control system.
The waste is processed with a five-stage sorting
method, divided into three parts: organic humus for
safe disposal, inorganic aggregates for resource
recycling, and light materials for incineration
power generation. Incinerators keep temperatures
above 850°C to decompose toxic dioxins, with
emissions far below national standards. The facility
generates 3.4 million kWh of electricity daily, powering
8,000 households.
Land remediation is carried out alongside
waste excavation. The restored land will release tens of
hectares of urban space, and the redevelopment will
bring land value growth and tax revenue to offset
remediation costs. This project sets a model for
megacities' sustainable development, combining
ecological, economic and social benefits.