| Team Feasibility Commitment 小组可行性承诺 |
| | | | | |
| | | | | |
| 1、Assessment for the feasibility:对可行性的考虑: |
| The team of product quality planning have evaluated the below items. The drawing and/or specification have been used as the basis for analysis of the capability of the team to fulfill all requirements. For all items with answer "No", there is attachment to explain our concerns and/or proposed changes, to ensure the team can fulfill the requirements.产品质量策划小组已考虑了以下问题。所提供的图样和/或规范已被用来作为分析组织满足所有规定要求的能力的基础。对于所有答案为“否”的问题项,都有附表表明我们的关注事项和/或建议的更改,以保证组织能够满足规定的要求。 |
|
| | | |
| Do you have experience of producing similar products? 是否有生产类似产品的经验? | | |
| Are the process &process design sufficiently evaluated for feasibility? Did you discuss with Hongfa design team for the advantage and disadvantage of the product design & process design? 是否充分评估工艺可行性?是否与宏发电力电器设计人员充分沟通/评估各种工艺优缺点? | | |
| Is the product structive sufficiently evaluated for manufacturing feasiility? Is it realizable for manufacturing tooling,fixture, equipment? 是否充分评估产品结构制造可行性?如模具、工装、设备是否可实现? | | |
| Is the material performance of the product evaluated for feasibility? E.g. flamibilty resitance, RoHS, insulation resistance requirments on drawing? 是否充分评估产品材料、性能可行性?如阻燃、RoHS、绝缘等性能等图纸要求是否可以达到? | | |
| Are the dimensions, tolerance sufficiently evaluated for feasibility? E.g. do you have proper tooling, equipment to ensure the machining accuracy? 是否充分评估产品尺寸、公差制造可行性?如模具、设备的加工精度,工装的定位精度是否足够保证? | | |
| Is the appearance requirement sufficiently evaluated for feasibility? E.g. can you meet the color, roughness, surface treatment requirements? 是否充分评估产品外观制造可行性?如颜色、粗糙度、花纹、表面处理等图纸要求是否可以达到? | | |
| Do you evaluate and understand all the product and process significant characteristics (laws, safety, gap configuration, etc.)? 产品和过程的特殊特性(法律、安全、间隙的配合,等等)是否完全理解? | | |
| Can every special characteristic within the short term capability (ppk of >= 2) be produced ? Long term capability cpk >=1.67 ? 是否能保证特殊特性的短期过程能力(ppk >= 2) ,长期过程能力( cpk >=1.67) ? | | |
| If critical characteristics CPK<1.67, do you have 100% inspection plan? 如果特殊特性cpk<1.67,是否有100%检查计划? | | |
| Is there any new tooling/fixture needed for this product? 产品是否需要增加模具(和/或)工装? | | |
| Is there any new machine/equipment needed for this product? 产品是否需要增加设备? | | |
| Is inspection jig needed for this product? 是否需要制作检具? | | |
| Did you define the quality inspection items to ensure product quality? 是否有确定质量检查项目,以确保产品的质量合格? | | |
| Do you evaluate and understand the product performance and reliability testing requirements and arrange the validation(Including materail and parts)? Is there a testing plan available? 供应商是否了解需供应商自己负责的性能\信赖性(可靠性)试验并已制订计划且每年安排验证(材料&零件)?是否明确试验方法?是否明确完成时间? | | |
| Are the necessary resources (e.g. manpower, qualifications, machines, testequipment, production area) for developing and producing the offered product available at the designateddevelopment- and production site for the defined date? 在规定的期限之前,是否有必要的资源(如人力,机器,设备,测试设备,生产区域)投入到该产品制造现场? | | |
| Have enough production capacity for series production per Hongfa project forecast? 有足够的产能生产该产品? | | |
| Can you identify any as yet untried possibilities for quality improvements or costreductions on characteristics, materials, processes, handling of materials ? 为了质量改进或者降低成本,是否充分评估在特殊特性,在材料,工艺,材料处理等方面进行优化的可能性? | | |
| Do you have a project plan (time schedule, product, process) including all essential milestones and are the schedules realistic ? 是否有一个项目计划(时间、产品、工艺流程),并包括所有重要的里程碑和时间表吗? | | |
| Is the lession learn of similar products discussed with Hongfa or vendor internal team? 是否与宏发电力电器或内部讨论并分享类似零件的经验与教训? | | |
| Is the Hongfa packaging requirement sufficiently evaluated? 供应商是否满足宏发电力电器包装的要求? | | |
| Is the Hongfa product traciblity requirement sufficiently evaluated? 是否充分满足宏发对产品追溯性要求? | | |
| | | | | |